The Building of Our New Log Home
1.) 10 Loads of Select fill had to be hauled in and leveled
2.) The concrete Guys put in the forms and the Plumbers did the sewer Rough in
3.) Concrete was poured just before the Rain!!
4.) The first of the lumber arrived and Building began
5.) Roof trusses were lifted into place with a crane and the sheathing and felt were nailed on
6.) windows were installed and plumbing/electrical was started
7.) The metal roof was installed

8.) The first snow... notice we got the front door, lights, and some of the log siding up!
10.)
11.)
12.) lots to go!! Maybe we will be in by summer